Technical Meeting Sponsored By : |
![]() |
Byford Rail Extension Track Design
Christian Silisilon and Stella Han (Track and Civil Engineers at KBR) will be presenting track stiffness, track slabs and turnouts on viaducts on Byford Rail Extension
Byford Rail Extension is a project being delivered by Metronet in WA which extends the existing electrified Armadale line by approximately 9km south to Byford. The project removes seven level crossings which included 3 being removed with an elevated viaduct approximately 1.7km long. The viaduct contains 6 turnouts and track slab system. The KBR presentation will cover the design challenges with regards to the following :
To attend PWI functions you must be a current financial member or corporate representative or guest. Please refer to the membership page for all memberships including corporate membership.
If you are not currently a member of PWI you can join via our Membership page. Upon joining you will receive a Login ID and password to register for events.
For any queries please contact victoria.pwi@pwinsw.org.au